8/27/2013
|
| Press Release - GE petitions to intervene in megaloads case.pdf |
BOISE
— General Electric, the fourth largest corporation in the world, has
petitioned to intervene in a federal lawsuit filed by Idaho Rivers
United and the Nez Perce Tribe. The suit seeks to protect the
Lochsa-Clearwater Wild and Scenic River corridor from transport of
enormous industrial megaloads bound for the tar sands of northern
Alberta.
“GE’s intervention shows how desperately the oil industry and their contractors want to convert one of America’s first Wild and Scenic River corridors into an industrial highway,” said IRU Conservation Director Kevin Lewis. “We need to have this discussion. They need to know the Lochsa-Clearwater is a national treasure, not an industrial corridor.” Citing “significant financial impact” and the potential to suffer “millions of dollars in lost revenue,” General Electric’s attorneys filed in federal court Monday, Aug. 26. The court scheduled a hearing for Sept. 9 at 4 p.m. at the federal courthouse in Boise. Though GE is citing potential financial losses, the company has known its shipments would meet resistance since at least last April, long before it barged megaloads up the lower Snake River and equipped them for transport through the Wild and Scenic corridor. In an April 4 letter, IRU’s attorney, Laird Lucas, relayed to industrial shipper Omega Morgan that use of Highway 12 violated multiple legal authorities and would be strongly opposed. “Resistance to mega-load shipments on Idaho’s Highway 12 remains strong, both among local citizens and among the many organizations committed to protecting the route,” Lucas wrote. “The strength of this opposition can increase both the time necessary to transport equipment on Highway 12 and the cost of this transport.” Still, Omega Morgan moved two GE-owned loads up the lower Snake River and trucked one through the Nez Perce Tribe’s reservation and the Wild and Scenic corridor, where the company met significant tribal and citizen resistance. “They set themselves up for this,” Lewis said. “They created this conflict. This is a place that’s not for sale. It doesn’t have a price.” Filed Aug. 8 during the shipment of GE’s first load, the IRU and Nez Perce Tribe lawsuit seeks an injunction to protect one of the first Wild and Scenic River segments in the nation. It charges that the U.S. Forest Service’s failure to stop the megaload from entering the Wild and Scenic corridor was “arbitrary, capricious, (and) an abuse of discretion.” The injunction would prevent megaloads while the Forest Service implements regulations to protect the corridor. “It’s obvious the Forest Service ought to be joining us and not GE,” Lewis said. Since the fall of 2008, the oil industry and a specialized group of shipping companies have been working to convert U.S. Highway 12 into an industrial high-and-wide corridor that prioritizes the transport of megaloads over other uses of the highway. And they’ve been doing so in flagrant violation of all applicable legal authorities. “To be clear, IRU is not anti-corporate. Some of our best supporters are large and responsible corporations like AIRE and Patagonia,” Lewis said. “But this is a clear example of the world’s largest companies exploiting local highways, a federally protected river corridor, a tribal homeland and local residents to further their corporate profits. And they’re doing it at the expense of a spiritual, scenic and recreational national treasure.” Omega Morgan has agreed not to attempt moving another megaload, already being stored at the Port of Wilma near Lewiston, until Sept. 18. |
Saturday, August 31, 2013
General Electric Files to Intervene in Federal Megaloads Court Case
Sunday, August 25, 2013
VIDEO PROOF THAT ITD & THE OIL COMAPNIES ARE LYING ABOUT MEGALOAD DELAYS
ITD states that in order to receive a permit "Over-legal loads are limited to 15-minute traffic delays." Anyone who's had the misfortune of being stuck behind or in front of one of these megaloads as they block the highway in both directions knows the wait in many places is much longer than 15 minutes. Now, a revealing video, taken from a steep hillside above U.S.12's Fish Creek Bridge during early August's Omega Morgan megaload transport, provides proof of ITD's -- and Omega Morgan's -- lie.
The embedded video, "Megaload Through Clearwater Country" documents
29 minutes of a 1-hour-25-minute traffic blockage caused by Omega
Morgan, clocked by a citizen timer, witnessed by approximately 75
on-site protesters.
Video footage by Roger and Janice Inghram
Sunday, August 11, 2013
Megaload Creates Delay and Protest in the Wild and Scenic Corridor
Thursday night, as the enroute
Omega Morgan megaload crawled up Hwy.12 alongside the Wild and Scenic Middlefork
Clearwater and Lochsa Rivers, approx. 75 people protested for over an hour at Fish Creek, Hwy.12 Milepost
120.


At Fish Creek,
as per its ITD-approved transport plan, Omega Morgan was required to
cross Fish Creek Bridge by unhitching the transport's trucks and using a
pull-cable. By unhitching the trucks, the 644,000 lb. transport was
reduced in weight to a point that ITD had determined would not likely
damage or break the bridge. The Fish Creek bridge is listed as a 'bridge of concern.'
All
traffic was blocked for 1 hour 20 minutes during the staging and
crossing, while the actual crossing took 43 minutes. All was observed
by the protesters, including 4 NPTEC members and Idaho Rivers United
Director Bill Sedivy, and recorded by a Fighting Goliath video camera.
In part because of its overnighting at Syringa, the transport was in the Lochsa-Clearwater Wild & Scenic corridor for 30 hours. It's actual travel time was 13 hours. You will recall that 1 of the 3 criteria that would trigger USFS review of megaload permits is that a transport not "require more than 12 hours to traverse US Highway 12 between MP 74 and 174." However, ITD issued Omega Morgan a permit for the load regardless of the USFS criteria, and Omega Morgan pushed its way into the corridor with complete disregard for the criteria and Federal law.
In part because of its overnighting at Syringa, the transport was in the Lochsa-Clearwater Wild & Scenic corridor for 30 hours. It's actual travel time was 13 hours. You will recall that 1 of the 3 criteria that would trigger USFS review of megaload permits is that a transport not "require more than 12 hours to traverse US Highway 12 between MP 74 and 174." However, ITD issued Omega Morgan a permit for the load regardless of the USFS criteria, and Omega Morgan pushed its way into the corridor with complete disregard for the criteria and Federal law.
Early Friday morning, as the transport navigated up the mountainside miles to Lolo Pass, it blocked all traffic, including several commercial trucks and a total of 20+ vehicles, for 40 minutes before crossing into Montana at 7:52 a.m
Idaho Rivers United & the Nez Perce Tribe File New Lawsuit Against the U.S. Forest Service
The lawsuit charges that the U.S.
Forest Service’s failure to stop a megaload from entering the river
corridor was “arbitrary, capricious, (and) an abuse of discretion.” Read the full press release
Thursday, August 8, 2013
Nez Perce Tribe Protests Illegal Megaload Shipments
Night 1:
Approximately 150+ blockaders participated on the first
night of the Omega Morgan transport. The
megaload transport had launched about 45 minutes late, at 10:45. As it
approached the reservation boundary at about 12:40, the blockaders walked out
onto the pavement to block the highway. The blockaders held back the
megaload convoy for almost 2 hours. The megaload, whose target for the
night was Hwy.12 Milepost 38.8, only managed to travel 3 more miles west of the
blockade. It's total miles, 11 miles, was 27.8 miles short of its
target.
Every member of the Nez Perce Tribe Executive Committee and
several other people were arrested. Others were forcefully removed by
police from the blockade and taken to the sidelines. Some were threatened
with mace.
Night 2:
More than 100 Nez Perces and others had created a 2 1/2-hour
human road block that, for a second night, halted the Omega Morgan megaload.
As the megaload eventually became able to inch forward, the blockaders
became a moving roadblock tightly bottlenecking the transport, moving with it,
and preventing it from gaining even modest speed. The number of police
officers at the scene was estimated to be double that of last night, perhaps as
many as 40, and about a half dozen people were arrested.
The Nez Perces staged tonight's blockade at Hwy.12 Milepost 11, below the legendary Ant & Yellowjacket rock archway perched above the highway about 2 miles upriver from the transport's launch point. The site is 1 of 38 Nez Perce National Historical Park sites strung along a 4-state route. One concern of the Nez Perces and other anti-megaload activists has been the effect of ground vibrations created by transports as immensely heavy as the Omega Morgan megaload. Complete with load, trailer, trucks, etc., the transport weighs 644,000 pounds, and ground vibrations theoretically over time could loosen rock and cliff structures alongside and above Hwy.12.
Ant & Yellow Jacket
picture from Nez Perce Historical Park
Night 3:
As the megaload left Mile 38.8 below Orofino, for the third night, the Nez Perces blockaded it. More police officers preceded the megaload than the previous 2 nights, and they aggressively drove their vehicles towards the blockade in an attempt to force the blockaders into retreating. When the Nez Perces held their ground, officers approached on foot, shouted "get off the road," and physically pushed some of the protesters toward the roadside. Yet the Nez Perces remained in a group and gradually began to move backwards, intentionally slowly, as the police vehicles and megaload convoy were relegated to following at a snail's pace for a mile or two through the Riverside area of Orofino.
The Omega Morgan megaload reached Hwy. 12 Milepost 90,
Syringa, last night, within the Clearwater National
Forest and the Wild & Scenic Middlefork corridor. They did
that by breaking the stipulations of their permit & filed travel plan.
Instead of stopping regularly to let traffic pass, as required, they held
all cars traveling east hostage behind 2 Idaho State Police vehicles, who led
what was at one point 40+ personal vehicles and forced them to travel at 0-17
mph speeds for 51.2 miles. In other words, corporate Canada 'owned' and
controlled your highway last night, aided by state police.

According to their plan, Omega Morgan's target destination had been the Kooskia kiosk station. However, apparently they felt they would be beyond more Nez Perce blockades if they could get farther up the highway. They are parked in a large private lot owned by Terry & Becky Jackson. Terry is the person who -- for pay -- lifts the tram cable that crosses the highway at Milepost 83 so megaloads can pass under it.
Idaho Officials Disregard Nez Perce Tribe and U.S Forest Service in Attempts to Please Multi-National Corporations
ITD’s recently issued permits to megaload transporter Omega
Morgan come after the recent court ruling, requiring Forest Service oversight
of megaload traffic. The USFS District
Manager, Rick Brazell warned the heavy-haul company that the agency does not
authorize the shipment through the Nez Perce Clearwater National Forests.
Brazell also accused the company of ignoring language in the state permit outlining Forest Service and Federal Highway Administration jurisdiction.
The Nez Perce Tribe also opposes this megaload shipment through their reservation and ancestral homelands.
“The tribe is shocked by Omega Morgan’s audacity," Nez Perce Tribal Chairman Silas Whitman said in a news release Monday. “The company has apparently decided it does not need to wait for Forest Service review or tribal consultation to move General Electric’s loads." Read More
Idaho Rivers United Press Release 8-8-13
|
| Release - Megaload enters Wild & Scenic corridor.pdf |
BOISE
— An unauthorized megaload traveling Highway 12 in north Idaho barreled
through the Nez Perce Reservation last night and entered U.S. Forest
Service land and the Wild and Scenic River corridor. It finally stopped
at Syringa near Milepost 90, 16 miles into the Wild and Scenic River
corridor.
“This is a sad day for Idaho. The Idaho Transportation Department, Omega Morgan and their Canadian clients have blatantly disregarded the wishes and regulations of the Forest Service and the wishes and requests of the Nez Perce Tribe,” said IRU Executive Director Bill Sedivy. IRU Conservation Director Kevin Lewis said IRU is pursuing legal options. “The Nez Perce Tribe has done an excellent job protesting this load’s shipment across the reservation, and now the load has entered public land and the Wild and Scenic River corridor,” he said. “This is a clear violation of the U.S. Forest Service’s order denying shipment across public land. We are consulting with our attorneys this morning and plan to proceed to protect the tribe’s homeland and our Wild and Scenic Rivers.” |
Monday, February 18, 2013
Highway 12: A Timeline
After the recent victory for Highway 12's Wild and Scenic corridor in a Boise courtroom, we thought it would be a good time to present a timeline of Highway 12 from it's creation to the present:
1961-1962: U.S. Highway 12 was built and paved through Idaho and into Montana.
1968: With passage of the Wild & Scenic Rivers Act, eight of the nation's most pristine rivers were designated Wild & Scenic. Among them were three Idaho rivers: the Selway & Lochsa, which join to form the third, the Middlefork Clearwater. For about 90 miles, the latter two -- Lochsa and MF Clearwater -- flow immediately alongside Hwy.12, and at Milepost 97, the Selway flows in from the southeast.
1995: The USFS, which has jurisdiction over these three rivers and the wild corridors through which they run granted a highway management easement to the Idaho Department of Transportation. Many residents, fearful that ITD would ignore Wild & Scenic protection mandates, spoke against the easement. In 1997, some revisions were written into the easement. Five small stretches of the highway were inadvertently, or otherwise, left out and remain left out today.
2008-2010: "Improvements" were madeon Highway 12, including the widening and rock filling of some turnouts, projects partially paid for by Exxon Mobil/Imperial Oil.
2010, spring: ITD and Exxon/Imperial made public a proposal to ship 200+ tarsands modules on U.S.12. Following consultations with Idaho Rivers United and Friends of the Clearwater, The Rural People of Highway 12 Fighting Goliath was launched, and in Montana, NoShipmentsNetwork and All Against the Haul, among others, had entered the fray. Numerous organizations and hundreds of individuals joined the anti-megaload fight, and Advocates for the West lawyer Natalie Havlina and director Laird Lucas began documenting developments. An Idaho District Court win involving ConocoPhillips' shipments, followed by a Supreme Court appeal, two unsuccessful contested cases (but that caused significant and costly time delays for the corporations), a court case win in Montana that stopped Exxon/Imperial in its tracks, protests, monitorings, comments and letters, and so much more. And then ...
Recent Articles about case:
The Mega-Myth About Mega-Loads
equities.com: If not industrial corridor's demise, something close
Judge Sides with Conservationists in Mega-Load Case
1961-1962: U.S. Highway 12 was built and paved through Idaho and into Montana.
1968: With passage of the Wild & Scenic Rivers Act, eight of the nation's most pristine rivers were designated Wild & Scenic. Among them were three Idaho rivers: the Selway & Lochsa, which join to form the third, the Middlefork Clearwater. For about 90 miles, the latter two -- Lochsa and MF Clearwater -- flow immediately alongside Hwy.12, and at Milepost 97, the Selway flows in from the southeast.
1995: The USFS, which has jurisdiction over these three rivers and the wild corridors through which they run granted a highway management easement to the Idaho Department of Transportation. Many residents, fearful that ITD would ignore Wild & Scenic protection mandates, spoke against the easement. In 1997, some revisions were written into the easement. Five small stretches of the highway were inadvertently, or otherwise, left out and remain left out today.
2008-2010: "Improvements" were madeon Highway 12, including the widening and rock filling of some turnouts, projects partially paid for by Exxon Mobil/Imperial Oil.
2010, spring: ITD and Exxon/Imperial made public a proposal to ship 200+ tarsands modules on U.S.12. Following consultations with Idaho Rivers United and Friends of the Clearwater, The Rural People of Highway 12 Fighting Goliath was launched, and in Montana, NoShipmentsNetwork and All Against the Haul, among others, had entered the fray. Numerous organizations and hundreds of individuals joined the anti-megaload fight, and Advocates for the West lawyer Natalie Havlina and director Laird Lucas began documenting developments. An Idaho District Court win involving ConocoPhillips' shipments, followed by a Supreme Court appeal, two unsuccessful contested cases (but that caused significant and costly time delays for the corporations), a court case win in Montana that stopped Exxon/Imperial in its tracks, protests, monitorings, comments and letters, and so much more. And then ...
2011, March: IRU filed its lawsuit against the USFS & FHWA.
2012, December: The Nez Perce Tribe filed a motion for amicus status in the case.
2013, Feb. 6th: Advocates for the West's Laird Lucas presented final arguments before U.S. District Judge B. Lynn Winmill, and Tribal lawyer Michael Lopez argued for amicus status.
2013, Feb. 7th: Judge Winmill ruled in IRU's favor.
Now: With the IRU win secured, all of us must remain engaged in order to ensure that the USFS does step up to protect the Wild & Scenic Lochsa--Middlefork Clearwater corridor from the kind of industrialization megaload transports would bring.
Recent Articles about case:
The Mega-Myth About Mega-Loads
equities.com: If not industrial corridor's demise, something close
Judge Sides with Conservationists in Mega-Load Case
Wednesday, June 13, 2012
Megaloads & Highway 12: A 2012 Update
The first half of 2012 has seen positive developments for the safety of Highway 12 and the protection of the Wild and Scenic River Corridors of the Clearwater and Lochsa Rivers. In February, Montana District Judge Ray Dayton ruled in favor of the plaintiffs (Missoula County, et.al) and remanded the issue to MDT stating further environmental review was needed. According to a 2/18/12 Missoulian article, in his decision, Dayton wrote: "Without first determining the scope of the project, i.e. whether the turnouts will be permanent or temporary, MDT could not meaningfully assess impacts associated with the KMTP."... "MDT therefore violated the Montana Environmental Policy Act and its implementing regulations." Judge Dayton also ruled that MDT needs to review Imperial Oil's use of alternative routes to transport reconfigured modules. (Read more)
In early March, ruling on dismissal motions, Idaho Federal Judge Winmill upheld most of Idaho Rivers United's suit against the USFS & FHWA. In the ongoing case, IRU is pursuing allegations that the 2 federal agencies should have used their authority under the Wild and Scenic Rivers Act to block state action permitting the transformation of the Wild & Scenic Lochsa-Clearwater U.S. Highway 12 corridor into a megaload truck route.
In a 3-10-11 press release, IRU stated it’s reasons for the lawsuit:
"The Middle Fork of the Clearwater and its tributary, the Lochsa, were among the first rivers protected under the Wild & Scenic Rivers Act in 1968. Idaho Sen. Frank Church championed the act, which also included among its first designations the Selway and Middle Fork of the Salmon rivers." The Clearwater and Lochsa rivers were singled out for designation because of their scenic, recreational, cultural, historic and other unique values.
“These rivers represent the embodiment of what the Wild & Scenic Rivers Act was meant to protect,” said IRU Conservation Director Kevin Lewis. “These rivers anchor cathedral-like forests that inspire awe, reflection and reverence. They are recreational Edens for fishermen, campers, hikers, hunters, bicyclists, history buffs, whitewater kayakers and rafters.
“We have a responsibility to protect the Clearwater and Lochsa — the way we see them now and enjoy them now — for our children and for their children. The Forest Service shares that responsibility and should be leading the charge for protection.”
(Read more.)
Mid-2012 is a good time to reflect on the brief history of Megaloads on Highway 12.
Just like the assurance from our Governor’s office that, “the shipper could delay traffic and close a small section of U.S. 12 for up to 15 minutes at a time for each load, and do this no more than two times over the entire route for each load" was false. So too were the statements of Imperial Oil saying that these loads could not be broken down into smaller shipments, or that the modules could only be made in South Korea and that the only shipping route available was Highway 12.
We know now for certain that the modules can be broken down, they can be made in Alberta among other places, there are numerous other routes available and the delays from these types of loads are multiple and longer than 15 minutes.
Back in late 2009 I’d never heard of the tar sands, the plight of Alberta steelworkers or large scale international trucking companies like Mammomet. All I knew was that the plan to ship loads that big on Highway 12 was more than crazy – it was dangerous. Instead of seeking local input or honestly responding to citizens concerns Exxon/Imperial went on a PR campaign trying to make this an environment vs. jobs issue in order to avoid having an honest discussion about the real costs involved with creating a permanent high and wide corridor through North Central Idaho. There are similar tactics being used right now with the Keystone XL pipeline. Instead of a rational discussion of the pros and cons of having a pipeline of the heavier tar sands oil stretching from Canada to the Gulf of Mexico, a PR campaign was launched identifying Big Oil as "job creators" and pipeline opponents as "job haters"and sticky-taping pipeline construction to lowering gas prices. Is the rush to get the pipeline built really about the handful of American jobs it would create or the billions of dollars Exxon will make if they have a pipeline that goes directly to the Gulf Coast and the International Oil markets? Will the XL guarantee lower gas prices? Some evidence suggests otherwise.... read
Subscribe to:
Posts (Atom)

